STEERING GEAR > REASSEMBLY |
| 1. INSTALL STEERING RACK END SUB-ASSEMBLY |
![]() |
Using SST, install the 2 steering rack end sub-assembly.
| *1 | Fulcrum Length |
| 2. INSTALL TIE ROD SUB-ASSEMBLY LH |
![]() |
Install the lock nut and the tie rod sub-assembly LH onto the steering rack end sub-assembly until the matchmarks are aligned.
| *1 | Matchmarks |
Tighten the 2 lock nuts.
| 3. INSTALL TIE ROD SUB-ASSEMBLY RH |
| 4. INSTALL TIE ROD END SUB-ASSEMBLY LH |
![]() |
Install the lock nut and the tie rod end sub-assembly LH onto the tie rod sub-assembly until the matchmarks are aligned.
| *1 | Matchmarks |
| 5. INSTALL TIE ROD END SUB-ASSEMBLY RH |
| 6. INSTALL STEERING GEAR HEAT INSULATOR (for 1ND-TV) |
![]() |
Install the steering gear heat insulator onto the steering gear and match the guide as shown in the illustration.
| *1 | Guide |
Install the 2 bolts.